Commissioning Management Services at £57m Energy Centre

Commissioning Management at Kettering General Hospital Energy Centre

Kettering Hospital

Banyards is pleased to announce that it is delivering Commissioning Management Services for Kettering General Hospital’s new £57m Energy Centre on behalf of IHP, further strengthening our ongoing relationship in the healthcare sector.

With the Energy Centre due for completion in April 2027, followed by associated plantroom works leading to full completion in September 2027, this flagship project marks a major milestone in modernising the hospital’s infrastructure and advancing its carbon reduction targets.

About the project  

Kettering Hospital Energy Centre Project

Originally opened in 1897, Kettering General Hospital serves North Northamptonshire, including Kettering, Corby, Wellingborough, Rushden, and surrounding communities. Over the decades, the historic site, initially constructed on a slope using traditional brick, timber, and slate, has grown through numerous additions and extensions.  

To support long-term growth and modern healthcare demands, the hospital is undergoing a major site redevelopment. Recent additions include a three-storey facility accommodating Paediatric Outpatients, Cardiac and Coronary Care Wards, Intensive Care Units, and High Dependency Wards.  

To enable this ongoing expansion, the hospital site requires extensive enabling works and masterplan developments, including the demolition of redundant building stock for Phases 1 and 2 of the Health Infrastructure Plan (HIP2) program, a new multi-storey car park, modular ward accommodation, a new Data Centre, and a state-of-the-art Energy Centre.

Decarbonisation and infrastructure upgrades  

The £57m Energy Centre project directly aligns with HIP2 and the wider commitment to achieve a Net Zero National Health Service.  

Key technical upgrades include replacing the site’s legacy steam district heating network with an efficient Low-Temperature Hot Water (LTHW) heat network. Powered by Air Source Heat Pumps (ASHP) and Water Source Heat Pumps (WSHP), the Energy Centre will feed 24 plantrooms scattered across the complex to deliver reliable heating throughout the entire site. From an electrical perspective, the project modernises and reinforces the estate’s high-voltage infrastructure through five satellite substations forming part of the HV ring, establishing a clear operational pathway to eliminate site carbon emissions in line with NHS target commitments.  

Banyards’ healthcare expertise  

Securing optimum performance, compliance, and efficiency in complex clinical environments requires a proven track record to demonstrate sector expertise.  

Banyards brings extensive healthcare sector experience from high-profile UK projects, including the Project Oriel New Moorfields Eye Hospital, National Rehabilitation Centre Loughborough, Luton & Dunstable  University Hospital Acute Services and Ward Blocks, Evelinas Children’s Hospital, Manchester Royal Infirmary, Midland Metropolitan Hospital Sandwell, Proton Beam Therapy Centre at The Christie, the Royal Liverpool Hospital, SuRNICC New Neonatal Ward at Glan Clwyd Hospital, Royal Brompton Hospital, Great Ormond Street various, Nuffield St Bartholomews, Ward 31 Refurbishment at Preston Hospital, Preston ED and New Operating Theatres at Chorley Hospital to name but a few.  

 

Managing commissioning on large-scale healthcare infrastructure transformations requires strict quality assurance and a highly experienced team to provide technical oversight.  

Banyards brings expert engineering teams to ensure all mechanical, electrical, and plumbing systems are fully tested, compliant, and integrated cost-effectively.  

Through robust Commissioning Management and Verification Services, Banyards will ensure that Kettering General Hospital’s £57m Energy Centre delivers safe, resilient, and highly efficient energy performance from day one.  

For more information about our service offerings within the Healthcare Sector, contact Banyards today.  


Image credit: University Hospitals of Northamptonshire Group.

Projects / Written 20th November, 2026

PLEASE READ THE TERMS OF THIS POLICY CAREFULLY BEFORE USING THE [BANYARDS’ PORTAL]

What’s in these terms?

This acceptable use policy sets out the terms that apply when you access or interact with the Banyards’ Portal.

Who we are and how to contact us

Our site is operated by Banyard Consultants Ltd (“We”). We are a limited company registered in England under company number 3847976.  Our registered office is 28-30, Worship Street, London, EC2A 2AH.  Our VAT number is GB 826 7615 08.

By using our site you accept these terms

By using our site, you confirm that you accept the terms of this policy and that you agree to comply with them.

If you do not agree to these terms, you must not use our site.

We recommend that you print a copy of these terms for future reference.

There are other terms that may apply to you

Our website Terms and our Privacy Notice also apply to your use of our site.

Portal Content

The Banyards’ Portal allows you to access information reports, data and test results to check and monitor the progress of work undertaken by third party contractors at your site.  You may only use the Banyards’ Portal for the purpose of accessing information in relation to Projects administered by us for you.

Access to the Banyards’ Portal

At the commencement of each Project you will be provided with a unique login password to enable you to access the Banyards’ Portal.  This will then enable you to review the current status on your various Projects.  You are responsible to ensure that the login password will only be given to those of your employees, agents or advisers whom you wish to access information from the Banyards’ Portal.

By accessing the Banyards’ Portal you will be able to review and download copies of information that are posted by us on your Client Portal.

Updating of Information

Information will be regularly updated by us and in any event within 7 days of verification by us of information provided by your contractors.

All information and data uploaded from time to time to your portal will be correct [at the time of upload].

If for any reason, outside our control, we are unable to upload information to the Banyard’s Portal then we will let you know by posting a message on our website and we will take all reasonable steps to minimise any delays in so doing.

If we fail to upload information to Banyards’ Portal in accordance with these terms and such failure arises from any delay on the part of your contractors or the supply by them of inadequate or incorrect information, then we shall have no liability to you arising from such delays or the uploading of incorrect or misleading information provided to us.

We may make changes to the terms of this policy

We amend these terms from time to time. Every time you wish to use our site, please check these terms to ensure you understand the terms that apply at that time.

Breach of this policy

When we consider that a breach of this policy has occurred, we may take such action as we deem appropriate.

Failure to comply with this policy constitutes a material breach of the terms of use upon which you are permitted to use our site, and may result in our taking all or any of the following actions:

  • Immediate, temporary or permanent withdrawal of your right to use the Banyards Portal.
  • Issue of a warning to you.
  • Legal proceedings against you for reimbursement of all costs on an indemnity basis (including, but not limited to, reasonable administrative and legal costs) resulting from the breach.

We exclude our liability for all action we may take in response to breaches of this acceptable use policy. The actions we may take are not limited to those described above, and we may take any other action we reasonably deem appropriate.

Which country’s laws apply to any disputes?

The terms of this policy, its subject matter and its formation (and any non-contractual disputes or claims) are governed by English law. By using our site you agree to the exclusive jurisdiction of the courts of England and Wales.

Effective Date

These Terms are effective from January 2019