Building Services Engineering Consultancy
Client
Seven Architects
Value
£1.2m
Since its re-opening, refurbishment works have been completed to create a new workspace with more works planned, including the remodelling of the existing Swimming Pool.
We were appointed to design the swimming pool HVAC services, which included a new swimming pool air handling unit complete with associated boiler plant. The air handling unit is going to be located externally on top of an existing back-of-house workshop, with the associated boiler plant located below. This allows for minimal external ductwork and piped services which are going to be hidden from view using architectural screening. On entry to the swimming pool, the ductwork transitions into a fabric duct which will be colour coded to match the new colour scheme within the swimming pool to allow the ductwork to be functional as means of ventilation whilst also complementary to the rejuvenated space.